{"edenmessageid":"ba9c69e5-4b96-ed11-a34d-0050568a2d1a","type":"Eden Message","licenceid":"a6cf18f7-67d8-e811-a2db-0050568a66b2","reference":"EM023979","status":"Closed","dateraised":"2023-01-17T00:00:00","closeddate":"2023-01-17T00:00:00","subject":"Decommission the on-site septic tank","message":"Dear Sir/Madam,\r\n\r\nThe septic tank has been cleaned and emptied by McBreen Environmental on the 24th of October 2022. All connection pipes were decommissioned prior to cleaning.\r\n\r\nThe site plans to excavate and decommission the septic tank when resurfacing works take place in the Casein Yard. Groundwater samples will then be taken after excavation works have been carried out.\r\n\r\nI hope this is to the satisfaction of the Agency.\r\n\r\nKind regards,\r\nCian Mac Cathmhaoil\r\nEHS Manager\r\nNorth Cork Creameries","response":"Response noted. \n\nThe licensee is reminded that soil samples are also required to be taken when the excavation works take place.\n\nThe licensee shall provide a further update on this matter by 17/02/2022. \n\nRegards,\n\nAdrian Farrell, \nOEE Inspector.   ","regardingobjectid":"cb145101-ce65-ed11-a34c-0050568a2d1a","taskid":"a489dc10-d465-ed11-a34c-0050568a2d1a"}